220KV power transformation line steel tube tower of Inner Mongolia electric power group Co., Ltd.
This project invested by Inner Mongolia electric power group Co., Ltd., and is a part of rural power network upgrading project. This project can not only optimize the relationship of power supply with power grids, but also can perfect the midwest rural power grids and power construction projects in places without electricity.
Located in Erdos city, length of the line is 120 kilometers. and our company took responsibility for the design, production, and transportation and installation. The project was completed in March 2013, this line overcame local’s problem of electricity use and unstable electricity, and also solved local’s living electricity problem.